Papers - Matsukawa Hiroaki
-
A Heuristic Search Algorithm for Solving Resource-constrained Project Scheduling Problem
Ahsan M. K. and De-bi Tsao
Asian-Pacific Journal of Operational Research 20 ( 2 ) 143-160 2003.11
Research paper (scientific journal), Joint Work, Accepted
-
A Heuristic Search Algorithm for Solving Resource-constrained Project Scheduling Problem
Ahsan M. K. and De-bi Tsao
Asian-Pacific Journal of Operational Research 20 ( 2 ) 143-160 2003.11
Research paper (scientific journal), Single Work
-
The Research on the Influence and Philosophic Theory of Lean Production in Advanced Manufacturing
Sun Linyan., Wang Jian and Cao (Tsao) Debi
Journal of Aeronautical Manufacturing Technology 6 ( 7 ) 31-35 2003.07
Research paper (scientific journal), Joint Work, Accepted
-
Solving Resource-constrained Project Scheduling Problems by Bi-criteria Heuristic Search Techniques
Ahsan M. K. and De-bi Tsao
Journal of System Science and System Engineering 12 ( 2 ) 190-203 - 203 2003.06
Research paper (scientific journal), Joint Work, Accepted
-
A Comment on ‘Solving Project Scheduling’ Problems with a Heuristic Learning Algorithm
Ahsan M. K. and De-bi Tsao
Journal of the Operations Research Society 54 ( 6 ) 666-668 2003.03
Research paper (scientific journal), Joint Work, Accepted
-
Studies on the Classification of Advanced Manufacturing Models
Sun Linyan., Wang Jian and Cao (Tsao) Debi
Journal of Mechanical Engineering 13 ( 1 ) 84-88 2002.02
Research paper (scientific journal), Joint Work, Accepted
-
The Systematic Analysis Method in Theory of Constraints and Its Application in Marketing Competition
Wang Jian., Cao (Tsao) Debi and Sun Linyan
Journal of Industrial Engineering and Management (China) 6 ( 3 ) 33-38 2001.12
Research paper (scientific journal), Joint Work, Accepted
-
安全在庫の集中とその配分時期の動的決定方法
TSAO DE-BI
日本経営工学会誌 52 ( 3 ) 172-179 2001.08
Research paper (scientific journal), Single Work
-
多段階在庫システムにおけるデカップリング在庫に関する研究
TSAO DE-BI
日本経営工学会誌 52 ( 2 ) 125-132 2001.06
Research paper (scientific journal), Joint Work
-
2段階分枝型在庫システムにおける補充レベルと留保量
TSAO DE-BI
日本経営工学会誌 51 ( 6 ) 550-557 2001.02
Research paper (scientific journal), Single Work
-
The Core Issues of Quick Response Strategy and its Development Tendency
Wang Jian, Cao (Tsao) De-bi and Sun Linyan
Journal of Industrial Engineering and Management (China) 5 ( 1 ) 22-25 2000.12
Research paper (scientific journal), Joint Work, Accepted
-
需要予測の誤差を用いた安全在庫の計算方法
TSAO DE-BI
日本経営工学会誌 51 ( 4 ) 372-379 2000.10
Research paper (scientific journal), Single Work
-
分枝型在庫システムにおける情報の共有効果について
TSAO DE-BI
経営情報学会誌 8 ( 4 ) 67-76 2000.03
Research paper (scientific journal), Joint Work, Accepted
-
A Study on the Determination of Replenishment Using Dynamic Approach in (1, m) Type Inventory System
J. W. Lee, C. Y. Lee, D.B. Tsao
Journal of the Korean Institute of Port Research (Korea) 14 ( 1 ) 37-45 2000.03
Research paper (scientific journal), Joint Work, Accepted
-
革新的製品と瞬時対応型サプライチェーンモデル
TSAO DE-BI
日本経営工学会誌 50 ( 6 ) 417-423 2000.02
Research paper (scientific journal), Joint Work, Accepted
-
発注納期より確定納期が遅れる取引きのPush/Pull型生産在庫
TSAO DE-BI
日本経営工学会誌 50 ( 3 ) 184-190 1999.08
Research paper (scientific journal), Joint Work, Accepted
-
納期延期を伴う需要の生産方式の選択問題
TSAO DE-BI
日本経営工学会誌 50 ( 1 ) 42-48 1999.04
Research paper (scientific journal), Joint Work, Accepted
-
需要の変動および配送平準化を考慮した多期間配送計画問題
TSAO DE-BI
日本経営工学会誌 48 ( 6 ) 321-330 1998.02
Research paper (scientific journal), Joint Work, Accepted
-
ロジスティクスシステムにおける情報共有化とリードタイム短縮/小ロット化の効果と対策に関する研究
TSAO DE-BI
日本経営工学会誌 44 ( 6 ) 501-509 1994.02
Research paper (scientific journal), Joint Work, Accepted
-
二回補充システムにおける在庫留保量の決定方法
TSAO DE-BI
日本経営工学会誌 43 ( 6 ) 431-438 1993.02
Research paper (scientific journal), Joint Work, Accepted