Presentations -
-
A Multi-Criteria Heuristic Search Technique for Resource-Constrained Project Scheduling Problems
Mohammad K. Ahsan and De-bi Cao
Informs annual conference (USA) ,
2001.11,Oral presentation (general)
-
The Integrated Inventory & Period Vehicle Routing Problem: A Heuristic Approach
Ahmad Rusdiansyah and De-bi Cao
Informs International Hawaii Conference (Hawaii, USA) ,
2001.06,Oral presentation (general)
-
A Hybrid Space Filling Curve Heuristic with 2-opt for TSP
CAO DE-BI
The 3rd Asia-Pacific Confrence on Industrial Engineering and Management Systems (Hongkong, China) ,
2000.12,Oral presentation (general)
-
Improving SFC Heuristic for TSP
CAO DE-BI
The Fifth China-Japan International Symposium on Industrial Management (Beijing, China) ,
2000.10,Oral presentation (general)
-
Demand forecasting and responsive supply chain model
CAO DE-BI
The 2nd Asia-Pacific Conference on Industrial Engineering and Management Systems (Kanazawa, Japan) ,
1999.12,Oral presentation (general)
-
A Research on Proper Length of Planning Horizon in Multiple Period Delivery Scheduling Problem
Cao De-bi, Enkawa Takao and Yang Byonghak
The 14th international conference on production research (Osaka, Japan) ,
1997.08,Oral presentation (general)
-
Centralized Safety Stock and its Replenishment Policy in CIM Environment
CAO DE-BI and Enkawa Takao
Second International Conference on Computer Integrated Manufacturing (Tokyo, Japan) ,
1993.09,Oral presentation (invited, special)
-
Second Replenishment Period and Variation in Two-phased Push Control System
CAO DE-BI
The 11th International Conference on Production Research (Hefei, China) ,
1991.08,Oral presentation (general)